
EV charger installation in Scarborough.
Beachside houses, apartment carparks, heavy salt exposure, and installs that need to survive a decade of onshore wind.
The install
What a Scarborough install actually looks like
Scarborough splits into two very different install jobs. The beachside houses along the Esplanade and West Coast Drive are premium standalone homes with garages and carports. The pockets further back toward Doubleview and Innaloo are a mix of older cottages, newer builds, and apartment complexes.
For the houses, the salt exposure is the whole conversation. Every screw, gland, bracket and isolator has to be marine-grade stainless or coated for coastal use. Standard hardware pits and fails within two years within a kilometre of the beach. We only quote sealed IP55 or better chargers within the Scarborough coastal zone.
For the apartments, the conversation is about strata approval, load capacity of the building supply, and whether the carpark power belongs to the owner or the body corporate. We handle that paperwork alongside the technical install so nothing stalls at the approval stage.

Charger picks
Which charger suits a Scarborough home
Tesla Wall Connector Gen 3
IP55 sealed housing handles the salt air. Small footprint suits coastal carports and townhouse walls.
myenergi Zappi GLO
Sealed and coastal rated, with solar diversion for the beachside homes that already run PV.
Wallbox Pulsar Plus (Copper SB)
For apartment carparks with shared metering. Built in energy monitoring and remote management from the body corporate side.

Solar first
Solar in Scarborough is worth the extra planning
The beachside strip gets exceptional sun and almost no shading. Solar yields here are among the best in Perth, and homeowners who invest in a proper system see payback in under four years even before the EV charger enters the picture.
For apartments, rooftop solar is often owned by the body corporate. Getting a private EV allocation from communal PV is possible but takes negotiation. We can quote both the technical and the process side.
Recent install
A recent Scarborough install
- Location
- West Coast Drive, Scarborough 6019
- The home
- Two-storey rendered coastal home, 10kW rooftop solar, three-phase supply, sheltered carport.
- The charger
- Tesla Wall Connector Gen 3, hardwired, on a corten steel accent wall inside the carport.
- Outcome
- Marine grade fixings throughout. Weatherproof isolator installed alongside. New three-phase RCBO in the switchboard. Half day on site.

What to know before install day in Scarborough
- Within 500m of the beach, budget for coastal grade hardware upgrades. It is worth the extra $150 to $250 per install.
- Apartment installs require strata approval in writing before we can begin. Allow two to four weeks lead time for that process.
- Older Scarborough homes sometimes still have overhead service lines and undersized sub mains. Both may need upgrading before a 32A EV load is safe.
Scarborough EV charging questions
I live in a Scarborough apartment. Can I get a charger?+
In most cases yes, but you need strata approval and confirmation that the carpark bay has a viable supply path. We handle both the paperwork and the install.
Will a normal charger survive the salt air?+
Not for long. We only install sealed IP55 or better units within the coastal zone, and we use marine grade fixings throughout. Cheaper hardware fails inside two years on this coast.
How long does a Scarborough install take?+
Half a day for a standalone house with modern electrical. Longer for apartments where strata approval and shared metering are involved.
Ready for a proper Scarborough EV install?
Free online quote in about 90 seconds. No pushy sales calls, no fake urgency.
