EV charger installation in Applecross.
Family homes on the peninsula, three-phase supply as standard, and two EVs in the garage more often than not.
The install
What an Applecross install actually looks like
Applecross is family territory. The homes are on generous blocks, most have double garages, and a huge share already have three-phase supply because of the pool, the workshop, or the ducted system installed a decade ago. That makes the EV install much easier here than in the inner suburbs.
The typical install is straightforward. Three-phase feed to a wall-mounted charger inside the garage, RCBO added to the switchboard, weatherproof isolator next to the unit. Done in a morning if the switchboard has capacity, done in a day if a small upgrade is needed.
The wrinkle that comes up often is the second car. If there is already a family EV and a plug-in hybrid on the way, we run the cable and hardware for a second charger at the same time. Half the labour, no need to disturb the wall twice.

Charger picks
Which charger suits a Applecross home
Fronius Wattpilot Home 22
Three-phase 22kW. Uses the supply that most Applecross homes already have. Cuts charge time on cars that support it in half.
myenergi Zappi GLO
Solar diverting for the majority of Applecross homes with PV. Family friendly app that any parent can operate.
Tesla Wall Connector Gen 3 (paired)
Two units load-shared across a single circuit. Ideal for the two-Tesla family that wants both cars ready by morning.

Solar first
Solar is standard here and it changes the maths
Around three quarters of Applecross homes have solar. Most systems are 6.6kW or larger, and battery adoption is growing fast on this peninsula. A smart charger set to divert solar first, then off-peak grid second, keeps the annual charging cost under $200 for most families we quote.
For homes without a battery yet, sizing the charger to match a future battery install saves rework. We factor that into the design rather than surprise the homeowner with it two years later.
Recent install
A recent Applecross install
- Location
- Waylen Bay Drive, Applecross 6153
- The home
- Single-storey brick and tile, 8kW rooftop solar, three-phase supply, double garage.
- The charger
- Fronius Wattpilot Home 22 on the internal garage wall, plus rough-in for a second charger next to it.
- Outcome
- Half day on site. New RCBO and dedicated three-phase EV circuit added. Second charger position wired and capped for a later install.

What to know before install day in Applecross
- Older three-phase installations in Applecross sometimes have unbalanced phases. Worth a check before adding a 22kW load onto whichever phase is already carrying the aircon.
- The peninsula gets river breeze but not heavy salt exposure. Standard IP54 hardware is fine for internal garage installs; IP65 for anything external.
- Double garages mean cable choices matter. If both bays might one day need a charger, plan the run for two circuits from day one.
Applecross EV charging questions
We have two EVs. Do we need two chargers?+
Not necessarily. Two chargers on a load-shared circuit is common in Applecross. Both cars plug in overnight, the charger splits the available current between them, and both are full by morning.
Can you use the three-phase we already have?+
Yes, and we usually recommend it. Three-phase 22kW is roughly three times faster than single-phase 7kW for compatible cars, and it costs no more to install if the supply already exists.
How long does an Applecross install take?+
Half a day is typical. A full day if the switchboard needs upgrading or if we are pre-wiring for a second charger.