A Baldivis estate home with the charger fitted inside the garage on install day.
Baldivis · 6171

EV charger installation in Baldivis.

New estates, modern switchboards, and some of the cleanest and quickest EV installs we do anywhere in Perth.

The install

What a Baldivis install actually looks like

Baldivis is overwhelmingly new. Most homes are post 2010, which means the switchboard is already modern, RCDs are already there, and there are usually spare ways sitting empty. That makes for very clean installs and short days on site.

Garages are attached and the meter box is nearly always a few metres away, so runs are short. In a lot of Baldivis homes the whole job is done in three to four hours from arrival to handover.

The one thing worth checking is whether the builder ran a conduit for a future charger. Plenty of estate builds did. If yours has one, the cable pull is trivial and the install gets even faster.

Modern estate board with spare ways. An EV circuit drops straight in without any rework.
Modern estate board with spare ways. An EV circuit drops straight in without any rework.
Baldivis estate streets at sunset. New builds, new boards, and rooftops built for solar.
Baldivis estate streets at sunset. New builds, new boards, and rooftops built for solar.

Solar first

New roofs, strong yields, weak export credits

Almost every Baldivis home we visit has solar and most arrays are unshaded and correctly oriented. The yields are genuinely good. The problem is that the export credit is worth a fraction of what the energy is worth in your own car.

Shift the charging to daylight where the driving pattern allows, and you convert cheap export into free driving. Where the car is out all day, off peak scheduling picks up the slack overnight.

Recent install

A recent Baldivis install

Location
Off Fifty Road, Baldivis 6171
The home
2018 estate build, 6.6kW solar, single phase, attached double garage with a builder conduit already in the wall.
The charger
Zappi 7kW tethered on the internal garage wall.
Outcome
Cable pulled through the existing conduit. New RCBO in the spare way. Solar priority configured. Three hours on site, start to finish.
Zappi 7kW in a Baldivis garage, set to charge off surplus solar during the day.
Zappi 7kW in a Baldivis garage, set to charge off surplus solar during the day.
Local considerations

What to know before install day in Baldivis

  • Check whether your builder left an EV conduit. It can shave real time and cost off the install.
  • Some estate homes have the meter box on the far side from the garage. Confirm the run length before comparing quotes.
  • Newer boards are usually fine, but a spare way is not the same as spare capacity. A quick load check is still worth doing.
FAQ

Baldivis EV charging questions

Why are Baldivis installs cheaper than older suburbs?+

Because the hard part is already done. Modern boards, short runs and sometimes a pre run conduit mean less labour and no upgrade work.

Can I install before I take delivery of the car?+

Yes, and it is often smart. The charger works with any Type 2 vehicle, so it is ready the day the car arrives.

Do I need approval from my estate or builder?+

Not usually for a standard install on a completed home. If the house is still under builder warranty, let them know before anything is fixed to the structure.

Perth FAQ

EV charger installation in Perth, answered

The questions we get asked most by WA homeowners, answered by the electricians who do the work.

Does Western Power need to be notified about my EV charger?+

For a standard single phase 7kW charger on an existing supply, no separate application is usually needed. Your electrician still lodges the required notice of completion with Building and Energy WA. If the install needs a bigger main switch, a service upgrade, or a move to three phase, that does go to Western Power first and it adds time to the job, so we check it before quoting.

Is single phase or three phase more common in Perth homes?+

Most Perth houses are single phase, which caps a home charger at about 7.4kW. Newer estates in areas like Ellenbrook, Baldivis and Canning Vale are more likely to have three phase already at the board, and a lot of older knock down rebuilds get it too. Lift the switchboard cover and count the incoming actives, or send us a photo and we will tell you.

Which Synergy plan is best once I have a home charger?+

Synergy runs time of use options aimed at EV owners with a cheap overnight window and a cheaper midday window built around WA's solar surplus. Charging in those windows rather than the evening peak is where the real savings sit. Check current rates on Synergy's site before switching, because the windows and prices change.

Should I charge from my solar instead of the grid in Perth?+

Usually yes. WA feed in tariffs are low, so exporting midday solar earns you very little while grid power costs several times more. A solar aware charger such as a myenergi Zappi or Fronius Wattpilot watches your export at the switchboard and pushes surplus into the car instead of sending it out for a few cents.

Do coastal Perth suburbs need a different charger?+

If you are in the salt spray zone near the coast from Mullaloo through Scarborough, Cottesloe and Fremantle, outdoor units cop corrosion. We fit chargers rated IP65 or better, use stainless or marine grade fixings, and where possible mount the unit inside the garage with only the tethered lead exposed.

What about summer heat and charger derating?+

Perth summers regularly sit over 40C, and a charger baking in full afternoon sun can throttle its output to protect itself. West and north facing walls are the worst spots. We site the unit in shade or under eaves where we can, which keeps it charging at full rate and extends the life of the electronics.

Can I get a charger installed in a Perth apartment or strata complex?+

Yes, but it is a different job to a house. You need strata approval, a metering plan so the electricity bills back to your lot rather than common property, and often a load managed charger so the building's supply is not overloaded. We put that documentation together for the strata council as part of the quote.

How does a limestone driveway or brick paving affect the cable run?+

Plenty of Perth homes have the switchboard on one side and the parking on the other, with paving or limestone in between. Where we can, we run the cable through the roof space or along the eaves to avoid lifting anything. When trenching is unavoidable we lift and relay pavers rather than cut them, and that extra work is priced up front, not added later.

Are there WA rebates for home EV chargers?+

WA does not currently run a state rebate on home charger installs. The EV rebate scheme that ran on vehicle purchases has closed. The saving comes from the tariff side instead: charging off peak or straight off your own solar. We will not quote a rebate that does not exist.

Who is legally allowed to install an EV charger in Perth?+

A licensed WA electrical contractor. The circuit has to be dedicated, protected by the correct RCD type for the charger, and wired to AS/NZS 3000 with the EV specific requirements of AS/NZS 3012 and the manufacturer's instructions. Candela is licensed under EC# 15317 and fully insured, and you get the compliance paperwork on completion.

Ready for a proper Baldivis EV install?

Free online quote in about 90 seconds. No pushy sales calls, no fake urgency.