Same brain. Three times the flow.
The Zappi you love, wired for three-phase. ~130 km of range per hour, full battery overnight on any 3-phase Perth home.
- Rated power
- 22 kW · 3P · 32 A
- Connector
- Type 2 tethered 6.5 m · or socket
- Solar divert
- Yes, balanced across phases
Licensed WA electricians · EC# 15317 · 10-year workmanship

22 kW at home. No public charger detours.
A lot of the new mid-size EVs land in Australia with 80–120 kWh batteries. On a standard 7 kW single-phase charger that's 12+ hours to fill from 20%. On the 22 kW Zappi it's under 4. The unit balances solar diversion across all three phases simultaneously, so if your panels are exporting 6 kW on phase A and 2 kW on phase C, Zappi feeds the surplus from both phases into the car cleanly, no oscillation. Every other feature, the app, the modes, the PEN protection, matches the 7 kW version. Just add two more phases and hold on.
Homes on 3-phase power running a mid-to-large battery EV, Kia EV9, Model X, ID.Buzz, Polestar 3.
- Up to 22 kW, roughly 130 km of range per hour
- Balances solar export across all three phases
- Same Eco+ / Eco / Fast modes as the 7 kW
- Ideal for larger batteries (EV9, Model X, ID.Buzz)
- Retrofits neatly into a 3-phase Perth switchboard
What sets the Zappi 22 kW apart.
22 kW peak
Full 32 A across all three phases. A Model X goes 20% to 80% in about 2 hours 40 minutes.
3-phase solar divert
Balances CT readings across all phases, perfect for larger rooftop systems that export unevenly through the day.
Pairs with home batteries
Priority stack, house, battery, then car, configured per household in the app. Even works with Tesla Gateway installs.
One app, everything
Zappi, eddi, harvi and libbi all sit in the myenergi app. Charge, hot water and battery status on one screen.
PEN protection built in
No separate earth rod required on most Perth 3-phase installs, saves trenching through the front lawn.
Retrofits cleanly
Compact 439 × 282 mm footprint fits between switchboard and the wall stud on 90% of homes we quote.
Every number that matters.
- Rated power
- 22 kW · 3P · 32 A
- Connector
- Type 2 tethered 6.5 m · or socket
- Solar divert
- Yes, balanced across phases
- Metering
- 3× CT clamps included
- Connectivity
- Wi-Fi 2.4 GHz · Ethernet
- Protection
- IP65 · IK10
- Dimensions
- 439 × 282 × 122 mm
- Warranty
- 3 yr myenergi · 10 yr install
Compliant with EN IEC 61851-1, IEC 62196-2 and AS/NZS wiring rules for WA.
Pick the phase.
- Tethered22 kWStandard supply3P · 32 A
- Socketed22 kWStandard supply3P · 32 A
Watch your sun turn into kilometres.
The GLO reads your switchboard 5× a second, then quietly diverts every spare electron into the car. Tap a mode to see how it flows.

Surplus solar only. Zero grid. Free kms.
One team. Certified. Done in a day.
- Step 01
Free online quote
Two minutes. Snap your switchboard, tell us your EV, we email a quote within 24 hours.
- Step 02
Site check and book
Our team confirms the cable run and load balancing, then locks in a date that suits you.
- Step 03
Certified install day
Licensed WA electricians. Wall mount, switchboard tie-in, RCD and full compliance paperwork.
- Step 04
App pairing and handover
We pair the unit to your Wi-Fi and set up solar or tariff profiles before we leave.
Everything Perth drivers ask.
Do I have three-phase power?+
About 25% of Perth homes do, most commonly on newer builds, larger blocks, or homes that were originally set up for pool heat pumps or ducted air. We check your switchboard on the free quote and confirm before recommending the 22 kW.
Can I install a 22 kW Zappi and downgrade later?+
Yes, the unit can be limited to 11 kW or 7 kW per phase in the app. Handy if your switchboard is at capacity today but you plan to upgrade.
Does 22 kW hurt the car's battery?+
AC charging up to 22 kW is gentle on the battery, the harsh chemistry happens at 150 kW+ DC. 22 kW AC nightly is genuinely fine long-term.
Will it charge from my rooftop solar?+
Yes, external CT clamps on your switchboard read real-time export and divert that free solar to the car before it hits the grid. Works with every inverter brand sold in WA.
How long does a Perth install take?+
Most single-phase installs are done in a single 3–4 hour visit. Three-phase or long cable runs can stretch to a full day. We book, wire, commission and app-pair on the same day so you drive off the next morning charged from your wall.
What warranty backs the install?+
The manufacturer warranty on the unit plus a 10-year Candela workmanship warranty on the mount, cable run, switchboard tie-in, RCD, isolators and any load-management gear we fit.
Get a price for the Zappi 22 kW.
Two minutes online and a photo of your switchboard. Our team emails your estimate inside 24 hours, then books a short consult to confirm it.



